Suriname - Brokopondo
Covering an area of 150,000 hectares, Brokopondo was created in 1964 by the construction of the Afobako Dam. Triton was contracted by the harvesting concession holder to conduct a reservoir wide timber assessment. Deploying specialized sonar and mapping equipment, Triton field crews established hundreds of survey plots across the reservoir as the basis for the assessment of the timber potential in Brokopondo.