OUR PROJECTS
Triton is the global leader in providing reservoir timber harvesting and management solutions. Regardless of location, Triton has a solution to meet your reservoir needs.
Founded in 2000, Triton has many journeys and accomplishments under our belt since inception. Triton is committed to developing the most suitable and technologically advanced equipment to harvest the world’s flooded forests. We excel at it. We also excel in providing reservoir forest management strategies. We are the world’s leaders in submerged forest management, hands down. Yes, we pride ourselves on this and take further pride in the full satisfaction of our global clients.
PETIT SAUT
PROJECT
Triton is actively preparing for our next endeavor: Petit Saut, French Guiana. We are aiming to harvest our first tree by Q4, 2022.
Contract
Services
Whether its clearing channels for ferry traffic, harvesting to reduce dam threats, providing management options for submerged timber or quantifying submerged forests in your reservoir, Triton has the professional expertise and technology to cover a broad spectrum of services.
NECHAKO RESERVOIR, BC
Triton deployed our Sawfish™ harvester in the Nechako Reservoir, sometimes called the Ootsa Lake Reservoir.
LAKE SHANNON, WASHINGTON, USA
Lake Shannon is a narrow reservoir on the Baker River in Washington, United States of America.
TUCURUI, BRAZIL
Triton completed a broad assessment of the submerged fiber basket in Tucurui using a combination of satellite imagery analysis, available pre-flood forest inventory data and forest cover maps.
GIBRALTAR MINES, WILLIAMS LAKE, BC
Triton was contracted to clear corridors through flooded forests within the Gibraltar Mine’s tailings pond.
AES, BRAZIL
AES Brazil Group (AES) commissioned Triton, to evaluate three reservoirs owned by AES in the State of Sao Paulo, Brazil.
JIRAU, BRAZIL
Triton was contracted by Energia Sustentável do Brasil S.A (ESBR) to examine options to recover 173,025m3 of harvested stems and related debris from the shores of the soon to be flooded Jirau Reservoir located on the Madeira River.
BAKUN, MALAYSIA
Triton was contracted by Wargana Consortium (WC), to conduct a Preliminary Field Assessment of the Bakun Reservoir. The Bakun Dam is an embankment dam located in Sarawak, Malaysia on the Balui River.
BROKOPONDO, SURINAME
Triton was contracted by Brokopondo Waltra Wood Inc. (BWWI), to conduct an underwater timber assessment of the 160,000ha Brokopondo reservoir in Suriname.
WILLISTON LAKE, MACKENZIE, BC
Triton was contracted by BGC Engineering Inc., to conduct an underwater survey of a portion of Williston Lake near Mackenzie, British Columbia.
GATUN LAKE, PANAMA
Triton was contracted by the Panama Canal Authority (ACP) to survey 5 parcels (768 hectares in total) of the reservoir that ACP was seeking to expand as anchoring locations for canal traffic.
CORUMBA III RESERVOIR, BRAZIL
Triton was contracted by Consorcio Empreendedor to undertake a feasibility Study to evaluate the viability of extracting submerged timber from the Corumba III reservoir.
BAYANO LAKE, PANAMA
Triton was contracted by CoastEco Timber Inc., to harvest the submerged forests in Bayano Lake.
Concession
Operations
Triton has owned and harvested reservoirs around the world. Locations have included reservoirs in North America, Asia, Central America, and Africa. We are now deploying our patented SHARC technology to Petit Saut in French Guiana, South America. Here, Triton shall responsibly manage and convert all harvested timber to its best end use, whether that is lumber or biomass to fulfill domestic and international markets.
LOIS LAKE, POWELL RIVER, BC
Triton first deployed the SAWFISH™ in Lois Lake, British Columbia, Canada, in an effort to test the technology.
KENYIR LAKE, MALAYSIA
Triton relocated to Kenyir Lake in Malaysia. Kenyir Lake was created in 1985 by the damming of the Kenyir River and provides water to the Sultan Mahmud Power Station.
LAKE VOLTA, GHANA
Volta Lake in Ghana has been Triton’s most comprehensive undertaking and accomplishment to date.